Monday, August 15, 2011

First Float

Robert and I have been absolutely busting tail working on the boat. Having it back in the garage has been wonderful--can work on it every time I get an hour free. I've worked on it every night for between 2 and 6 hour blocks.

Took Kendell with me, an we floated the boat at Mallard Bay, and it sits just right. The chines come up out of the water about 3/4 of the way up so that's going to result in a little hull slap, but I am okay with trading that for a better ride than I had on the old Pathfinder.

Back to fairing.




No comments:

Post a Comment